PTM Pro — Detailed Installation Report
Itemized installations by system with assignments, schedule and totals
Total
2
Completed
0
In Progress
2
Not Started
0
On Hold
0
Avg Progress
10.0%
Project: All System: All Status: All Date Kind: Planned From: To:
ACS
Installation #2 in_progress
Progress: 20%
Project 1
Floor / Zone 4 / 1
Location test room
Planned / Installed 2025-10-24 / 2025-10-25
Assignee • Team Lead — • —
Technicians Muneeb
Created 2025-10-23 11:56:39 by —
Item / FieldValueStatus
Panel Name TS4WARD Done
Panel Code 1 Done
Controller Model TS2 Done
Reader Qty 6 Done
Cable Length M 50 Done
Remarks Pending
System Totals — ACS
MetricTotal
Reader Qty6.00
Cable Length M50.00
FAS
Installation #1 in_progress
Progress: 0%
Project 1
Floor / Zone Basement floor / Pharmacy
Location
Planned / Installed 2025-09-23 / 2025-09-26
Assignee • Team Lead — • —
Technicians
Created 2025-09-25 04:48:08 by —
Item / FieldValueStatus
Panel Name fas4thflr Done
Loop No 1 Done
Detector Qty 10 Done
Sounder Qty 3 Done
Cable Length M 200 Done
Remarks Pending
System Totals — FAS
MetricTotal
Loop No1.00
Detector Qty10.00
Sounder Qty3.00
Cable Length M200.00
Grand Totals (All Systems)
MetricTotal
Reader Qty6.00
Cable Length M250.00
Loop No1.00
Detector Qty10.00
Sounder Qty3.00